International Turkmenbashi Port Project



















In the International Turkmenbashi Port Project; 1. Excavation, assembly, testing, and filling of all "Stormwater lines, Wastewater lines, Drinking water lines, Fire water lines, and Fire water network water tanks" of the entire project, with our own construction machinery. 2. Excavation, pipe assembly, CLS concrete bedding and encasement, testing, and filling of all "Electrical infrastructure construction works" of the entire project, with our own construction machinery. 3. We successfully completed all reinforced concrete and architectural works for all foundations and pedestals in the Terminal, Shipyard, Hospital, Control Center, Wagon - Truck loading and unloading ramps, Administrative and Service buildings, and the Conveyor area; all reinforced concrete structures and architectural works in the Cement silos, Grain silos, and open storage areas, partially with materials, in accordance with the work schedule.
Employer
GAP İnşaat Yatırım ve Dış Ticaret A.Ş.
Location
Turkmenbashi, Turkmenistan
Start Date
September 2016
End Date
May 2018
Scope
Electrical Infrastructure, Mechanical Infrastructure, Reinforced Concrete Structure, and Architectural Works